Loading...
Decorative image representing the current section
KUDGIP
CO2 Battery (144 MWHr / 18 MW) at NTPC Kudgi
VRFB
Vanadium Redox Flow Battery (3 MWHr VRFB) Storage at NETRA
2 lakh Bricks JPG
Carbonated Brick (660 Lakh C-Brick/Yr) Plant at NTPC Ramagundam
CO₂ to Ethanol
Flue Gas CO₂ to Gen-4 Ethanol ( 10 TPD ) Plant at NTPC Pudimadaka
A20 TPD Carbon Capture Plant
Flue Gas CO2 to Methanol (10 TPD) Plant at NTPC Vindhyachal
CO2 to SAF
Flue Gas CO₂ to SAF (1,800 TPA ) Plant at NTPC Pudimadaka
Plasma
Plasma Gasification based Green Hydrogen (1 TPD) Plant at NETRA Plant at Netra)
sim1
Sea Water based Green Hydrogen (1 TPD) Plant at NTPC Simhadri NTPC Simhadri)
Falg 1
FALG Coarse Aggregate (30,000 m3/Yr) Plant at Korba
Coal Gasification Process
Grid Stabilization: Coal Gasification based Synthetic Natural Gas (SNG)
4 MW Solar Plannt
AC Microgrid at Netra ( 1 MW Hr BESS integrated with 4 MWp Ground Mounted Solar PV )
AFM
Activated Filter Media (AFM) Based (4 MLD) Tertiary Treatment Plant at NTPC Dadri