| अप्रैल 01, 2026 |
Intimation regarding COD and Transfer of Coal Mine to NTPC Mining Ltd. |
View/Download |
| अप्रैल 01, 2026 |
Revised Intimation regarding COD and Transfer of Coal Mine to NTPC Mining Ltd. |
View/Download |
| अप्रैल 01, 2026 |
The total installed capacity of NTPC group stands at 89,108 MW and commercial capacity at 88,028 MW.. |
View/Download |
| अप्रैल 01, 2026 |
Declaration of COD of Ayana Renewable Power Four Private Limited, a group company of NGEL, as detailed below:
1.The fourth part capacity of 37.5 MW Solar out of the total installed capacity of 150 MW Solar Project located in Gujarat, w.e.f. 2nd April 2026.
2.The seventh part capacity of 13.2 MW Wind out of the total installed capacity of 92.4 MW (Wind) and 37.5 MW (Solar) as part of 100 MW Hybrid Project located in Gujarat, w.e.f. 2nd April 2026. |
View/Download |
| मार्च 31, 2026 |
Declaration of COD of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NTPC Green Energy Limited as follows:
The twelfth and the last part capacity of 78.02 MW out of 1255 MW Khavda-I Solar PV Project located in Gujarat, w.e.f. 31st March 2026.
The sixth part capacity of 90 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat, 31st March 2026. |
View/Download |
| मार्च 30, 2026 |
Intimation regarding Change in the Senior Management- Cessation. |
View/Download |
| मार्च 28, 2026 |
Disclosure regarding approval of following at Board Meeting held on 28.03.2026
1.Investment proposal for Battery Energy Storage System
2.Additional equity commitment of Rs 3,173.67 Crore in Meja Urja Nigam Private Limited. |
View/Download |
| मार्च 28, 2026 |
Declaration of COD of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NTPC Green Energy Limited as follows:
i.Third and last part capacity of 75 MW out of 500 MW Bhadla Solar PV Project located in Phalodi, Rajasthan, w.e.f. 25th March 2026.
ii.Fifth part capacity of 105 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat w.e.f. 29th March 2026. |
View/Download |
| मार्च 26, 2026 |
Intimation of ESG rating by MSCI ESG Ratings. |
View/Download |
| मार्च 24, 2026 |
Intimation of ESG rating by ESG Risk Assessments & Insights Limited. |
View/Download |
| मार्च 23, 2026 |
Intimation regarding Trading Window Closure for the quarter ending 31st March 2026. |
View/Download |
| मार्च 19, 2026 |
Press Release titled signing of MoU between NTPC Limited and Octopus Energy Group. |
View/Download |
| मार्च 19, 2026 |
Declaration of COD of fourth part capacity of 165 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. |
View/Download |
| मार्च 10, 2026 |
Declaration of COD of second part capacity of 91.6 MW out of 250 MW Solar PV Project located in Andhra Pradesh by a group company of NGEL. |
View/Download |
| मार्च 10, 2026 |
Declaration of COD of third part capacity of 270 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL. |
View/Download |
| फ़रवरी 28, 2026 |
Notice from the Stock Exchange for the quarter ended 31.12.2025.
|
View/Download |
| फ़रवरी 27, 2026 |
Intimation regarding Change in the Senior Management- Cessation. |
View/Download |
| फ़रवरी 27, 2026 |
Intimation regarding receipt of the order from the Additional Commissioner CGST & Central Excise, Patna-1, of Bihar state. |
View/Download |
| फ़रवरी 26, 2026 |
Press Release titled signing of MoUs between NTPC and Gujarat Mineral Development Corporation Limited (GMDC). |
View/Download |
| फ़रवरी 26, 2026 |
Declaration of COD of first part capacity of 50 MW out of 200 MW Dayapar Wind Energy Project Phase-II of NTPC Renewable Energy Limited. |
View/Download |
| फ़रवरी 25, 2026 |
Completion of acquisition of Sinnar Thermal Power Limited by Consortium of NTPC Ltd and Maharashtra State Power Generation Company Limited (MAHAGENCO) on 24th February 2026. |
View/Download |
| फ़रवरी 20, 2026 |
Declaration of COD of part capacity of 158.4 MW out of 250 MW Solar PV Project located in Andhra Pradesh, by a group company of NTPC Green Energy Limited. |
View/Download |
| फ़रवरी 20, 2026 |
Declaration of COD of second part capacity of 165 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. |
View/Download |
| फ़रवरी 18, 2026 |
Intimation regarding waiver of fine levied under of SEBI (LODR) Regulations, 2015. |
View/Download |
| फ़रवरी 17, 2026 |
Intimation of Credit Rating by India Ratings and Research Pvt. Ltd. |
View/Download |
| फ़रवरी 16, 2026 |
Declaration of Commercial Operation of additional 5 MW capacity of Maroda reservoir-I solar power project of NSPCL. |
View/Download |
| फ़रवरी 09, 2026 |
Declaration of COD of eleventh part capacity of 14.43 MW out of 1255 MW Khavda-I Solar PV Project under CPSU scheme Phase-II Tranche-III of NTPC Renewable Energy Limited. |
View/Download |
| फ़रवरी 07, 2026 |
Pursuant to SEBI Circular No. HO/38/13/11(2)2026-MIRSD-POD/ I/3750/2026 dated 30th January 2026, please find attached copies of Newspaper clippings containing the notice published by the Company dated 7th February 2026. |
View/Download |
| फ़रवरी 04, 2026 |
Declaration of COD of second part capacity of 125 MW out of 500 MW Bhadla Solar PV Project of NTPC Renewable Energy Limited. |
View/Download |
| फ़रवरी 01, 2026 |
Transfer of Coal Mines of NTPC Limited to NTPC Mining Limited w.e.f. 1st February 2026. |
View/Download |
| जनवरी 31, 2026 |
Transfer of Coal Mines of NTPC Limited to NTPC Mining Limited |
View/Download |
| जनवरी 30, 2026 |
Outcome of Meeting of the Board of Directors regarding Office Memorandum dated 16th January 2026 received from Ministry of Power, Government of India pertaining to PTC India Limited. |
View/Download |
| जनवरी 30, 2026 |
Declaration of COD of first part capacity of 210 MW out of 1200 MW Khavda-II Solar PV Project of NTPC Renewable Energy Limited. |
View/Download |
| जनवरी 29, 2026 |
Intimation regarding Change in the Senior Management- Cessation. |
View/Download |
| जनवरी 28, 2026 |
Declaration of COD of tenth part capacity of 130.47 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited |
View/Download |
| जनवरी 23, 2026 |
Details of conference call to be held on 30th January 2026 to discuss the Company’s results for the quarter, and nine months ended 31st December 2025 with the Analysts and Investors . |
View/Download |
| जनवरी 23, 2026 |
Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation |
View/Download |
| जनवरी 22, 2026 |
Corporate Action-Board to consider Dividend |
View/Download |
| जनवरी 22, 2026 |
Board Meeting Intimation for Unaudited Results for the Quarter and Nine Months Ended 31St December, 2025 and Declaration of Second Interim Dividend for the Financial Year 2025-26. |
View/Download |
| जनवरी 22, 2026 |
Closure of Trading Window |
View/Download |
| जनवरी 16, 2026 |
Declaration of COD of third part capacity of 37.5 MW Solar, by a group company of NTPC Green Energy Limited, w.e.f. 17th January 2026 |
View/Download |
| जनवरी 15, 2026 |
Declaration of COD of First part Capacity of 300MW out of 500MW Bhadla Solar PV Project in Rajasthan of NTPC Renewable Energy Limited. |
View/Download |
| जनवरी 13, 2026 |
Confirmation Certificate in the matter of Regulation 74(5) of Securities and Exchange Board of India (Depositories and Participants) Regulations, 2018. |
View/Download |
| जनवरी 09, 2026 |
Intimation of execution of Shareholder Agreement between Maharashtra State Power Generation Company Limited and NTPC Limited on 9th January 2026. |
View/Download |
| जनवरी 08, 2026 |
Amendment to the Code of Practices and Procedures for Fair Disclosure of Unpublished Price Sensitive Information of NTPC CODE OF PRACTICES AND PROCEDURES FOR FAIR DISCLOSURE OF UNPUBLISHED PRICE SENSITIVE INFORMATION |
View/Download |
| जनवरी 02, 2026 |
Rumour Verification Letter |
View/Download |
| दिसम्बर 31, 2025 |
Change in Senior Management due to superannuation w.e.f. 31.12.2025 |
View/Download |
| दिसम्बर 30, 2025 |
Declaration of COD of Ninth Part Capacity of 13.98 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited |
View/Download |
| दिसम्बर 24, 2025 |
Declaration of COD of the Eighth Part Capacity of 69.04 MW out of 1255 MW Khavda-I Solar PV Project located in Gujarat under CPSU Scheme Phase-II Tranche-III of NTPC Renewable Energy Limited |
View/Download |
| दिसम्बर 24, 2025 |
Declaration of Commercial Operation of second & last part capacity of 13 MW out of 23 MW of Solapur Solar PV Project at NTPC Solapur |
View/Download |
| दिसम्बर 24, 2025 |
Intimation regarding closure of trading window for declaration of financial results for the quarter and nine months ending on 31.12.2025. |
View/Download |
| दिसम्बर 23, 2025 |
Formation of Joint Venture Company with EDF Power Solutions of India Private Limited and formation of a Wholly-Owned Subsidiary in Mauritius |
View/Download |
| दिसम्बर 17, 2025 |
Declaration of COD of Part Capacity of 243.66 MW out of 1255 MW Khavda-I Solar PV Project under CPSU Scheme Phase-II Tranche-III in Gujarat of NTPC Renewable Energy Limited |
View/Download |
| दिसम्बर 17, 2025 |
Declaration of COD of the fifth part capacity of 37.925 MW out of 300 MW Khavda Solar Energy Project under 450 MW Hybrid Tranche V Project in Gujarat of NTPC Renewable Energy Limited |
View/Download |
| दिसम्बर 17, 2025 |
Intimation regarding receipt of the order from the Assistant Commissioner State Tax, Delhi |
View/Download |
| दिसम्बर 17, 2025 |
Declaration of Commercial Operation of Second & Last Part Capacity of 78 MW out of 245 MW at Plot-1 of NTPC'S Nokh Solar PV Project (3X245 MW) under CPSU Scheme Phase-II, Tranche -II |
View/Download |
| दिसम्बर 11, 2025 |
Declaration of COD of Unit III (250 MW) of Tehri PSP (4X250 MW) of THDC India Limited |
View/Download |
| दिसम्बर 10, 2025 |
Declaration of COD of Part Capacity of 6.6 MW (Wind) by a Group Company of our Subsidiary NTPC Green Energy Limited |
View/Download |
| दिसम्बर 09, 2025 |
Intimation of ESG Rating by NSE Sustainability |
View/Download |
| दिसम्बर 05, 2025 |
Intimation of incorporation of subsidiary & joint venture company namely “Chhattisgarh NTPC Green Energy Limited” of NTPC Green Energy Limited (a wholly-owned subsidiary of NTPC) |
View/Download |
| दिसम्बर 03, 2025 |
Newspaper publication regarding transfer of equity shares to IEPF. |
View/Download |
| दिसम्बर 01, 2025 |
Disclosure regarding transfer of Kerandari Coal Mine from NTPC to NTPC Mining Limited (NML) w.e.f. 1st December 2025. |
View/Download |
| नवम्बर 29, 2025 |
Notices received from Stock Exchanges regarding imposition of fines due to non-compliance w.r.t. composition of Board of Directors |
View/Download |
| नवम्बर 28, 2025 |
Intimation of NCLT Approval on Resolution Plan Submitted by Consortium of NTPC And MAHAGENCO in CIRP of Sinnar Thermal Power Limited. |
View/Download |
| नवम्बर 19, 2025 |
Declaration of COD of Part Capacity of 75.50 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited |
View/Download |
| नवम्बर 12, 2025 |
Upgradation of NTPC Limited's ESG rating from CCC to B |
View/Download |
| नवम्बर 10, 2025 |
Newspaper publication regarding special window for re-lodgement of transfer requests of physical securities of NTPC Limited |
View/Download |
| नवम्बर 06, 2025 |
Transcript of Conference Call held with Analysts and Investors on 30 October 2025 |
View/Download |
| नवम्बर 04, 2025 |
Declaration of COD of Unit#1 (800 MW) of Patratu STPP, Phase-I (3x800 MW) of Patratu Vidyut Utpadan Nigam Limited (PVUNL) |
View/Download |
| अक्टूबर 31, 2025 |
Change in Senior Management due to superannuation on 31.10.2025 |
View/Download |
| अक्टूबर 30, 2025 |
Operational & Financial Snapshot of the Company for the Quarter and Half Year ended 30 September 2025 |
View/Download |
| अक्टूबर 30, 2025 |
Link for Audio Recording of conference call held with Analysts & Investors on 30 October 2025 |
View/Download |
| अक्टूबर 30, 2025 |
Submission Of Unaudited Financial Results for The Quarter and Half Year Ended 30 September 2025 and Declaration of First Interim Dividend |
View/Download |
| अक्टूबर 29, 2025 |
Categorization of NTPC’s Wholly owned Subsidiary namely NTPC Green Energy Limited as a Schedule A Central Public Sector Undertaking (CPSE) by the Government of India |
View/Download |
| अक्टूबर 29, 2025 |
Clarification on ESG Rating given by M/s SES ESG Research Private Limited without engagement |
View/Download |
| अक्टूबर 27, 2025 |
Intimation of conference call/Analyst Investor meet |
View/Download |
| अक्टूबर 27, 2025 |
Details of conference call to be held on 30th October 2025 to discuss the Company’s results for the quarter, and half year ended 30th September 2025 with the Analysts and Investors . |
View/Download |
| अक्टूबर 25, 2025 |
Completion of Trial Operation of Unit -1 (800 MW) Of Patratu Super Thermal Power Project, Stage-1(3X800mw) |
View/Download |
| अक्टूबर 24, 2025 |
Intimation of closure of Trading Window from 1st October 2025 till 1st November 2025. |
View/Download |
| अक्टूबर 24, 2025 |
Intimation of fixation of record date for the purpose of ascertaining eligibility of shareholders for the payment of Interim Dividend, if declared |
View/Download |
| अक्टूबर 24, 2025 |
Declaration of COD of Part Capacity Of 9.9 MW (Wind) by a Group Company of NTPC’s Subsidiary i.e. NTPC Green Energy Limited |
View/Download |
| अक्टूबर 24, 2025 |
a) Intimation regarding holding of Meeting of the Board of Directors to consider: Un-audited Financial Results for the quarter and half year ended 30th September 2025 - Declaration of interim dividend for the Financial Year 2025-26, if any
b) Intimation regarding fixation of record date for payment of interim dividend for the Financial Year 2025-26, if any
c) Intimation regarding Closure of Trading Window |
View/Download |
| अक्टूबर 19, 2025 |
Declaration of COD of the fourth part Capacity of 37.95 MW out of 300 MW Khavda Solar Energy Project of NTPC Renewable Energy Limited |
View/Download |
| अक्टूबर 17, 2025 |
Declaration of COD of Part Capacity of 95.75 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited |
View/Download |
| अक्टूबर 16, 2025 |
Declaration of COD of Part Capacity Of 12.5 MW (Solar) by a Group Company of our Subsidiary NTPC Green Energy Limited w.e.f. 17.10.2025 |
View/Download |
| अक्टूबर 13, 2025 |
Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011 |
View/Download |
| अक्टूबर 09, 2025 |
Press release titled “NTPC and Govt of Gujarat Join Hands to Explore Opportunities in Energy Sector” |
View/Download |
| अक्टूबर 09, 2025 |
Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 for the quarter ended 30.09.2025 |
View/Download |
| अक्टूबर 01, 2025 |
Disclosure regarding transfer of two Coal blocks/mines to NTPC Mining Limited |
View/Download |
| सितम्बर 30, 2025 |
Change in Senior Management due to superannuation on 30.09.2025 |
View/Download |
| सितम्बर 26, 2025 |
Declaration of COD of Part Capacity of 25 MW (Solar) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited |
View/Download |
| सितम्बर 26, 2025 |
Disclosure regarding Revised Cost Estimate of North Karanpura Super Thermal Power Project (3X660 MW |
View/Download |
| सितम्बर 26, 2025 |
Disclosure regarding approval of following at Board Meeting held on 26.09.2025: (i) Equity infusion in NEEPCO (ii) Proposal for setting of MSW to Torrefied Charcoal Facility by APCPL. |
View/Download |
| सितम्बर 25, 2025 |
Declaration of Commercial Operation of 167 MW Out Of 245 MW At Plot-1 of NTPC's Nokh Solar PV Project (3X245 MW) Under CPSU Scheme Phase-II, Tranche -IIl |
View/Download |
| सितम्बर 24, 2025 |
Declaration of COD of Part Capacity Of 9.9 MW (Wind) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited |
View/Download |
| सितम्बर 24, 2025 |
Declaration of COD Of Unit II (660 MW) Of Khurja STPP (2X660 MW) Of THDC India Limited. |
View/Download |
| सितम्बर 24, 2025 |
Intimation regarding closure of Trading Window for declaration of financial results for Q2 of FY 2025-26 |
View/Download |
| सितम्बर 22, 2025 |
Disclosure regarding order received from Principal Commissioner Central Tax Visakhapatnam of Andhra Pradesh |
View/Download |
| सितम्बर 16, 2025 |
Declaration of COD of Part Capacity of 100 MW (Solar) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited |
View/Download |
| सितम्बर 11, 2025 |
Newspaper publication regarding special window for re-lodgement of transfer requests of physical securities of NTPC Limited |
View/Download |
| सितम्बर 10, 2025 |
Appointment of Statutory Auditor by Comptroller & Auditor General of India for the Financial Year 2025-26 (same as Financial Year 2023-24 and 2024-25) |
View/Download |
| सितम्बर 04, 2025 |
Disclosure regarding discontinuation of operations of Tanda Thermal Power Station, Stage-I (4X110 MW) |
View/Download |
| सितम्बर 02, 2025 |
Voting Results (in searchable mode) of 49th AGM |
View/Download |
| सितम्बर 02, 2025 |
Declaration of COD of Part Capacity of 25 MW (Solar) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited w.e.f. 03.09.2025 |
View/Download |
| सितम्बर 01, 2025 |
Voting Results and Scrutinizer''s Report of 49th Annual General Meeting of NTPC Limited held on 29th August 2025. |
View/Download |
| अगस्त 30, 2025 |
Notices received from Stock Exchanges regarding imposition of fines due to non-compliance w.r.t. composition of Board of Directors and Board level Committees |
View/Download |
| अगस्त 29, 2025 |
Proceedings of 49th Annual General Meeting of the Company held on 29th August 2025. |
View/Download |
| अगस्त 29, 2025 |
Change in Senior Management due to superannuation on 31.08.2025 |
View/Download |
| अगस्त 28, 2025 |
Disclosure regarding Board approval on a partial modification regarding the transfer of its coal mining business to its wholly owned subsidiary, NTPC Mining Limited (NML) |
View/Download |
| अगस्त 28, 2025 |
Disclosure regarding Board approval on Revised Cost Estimate-I (RCE-I) of Rammam-III HEPP (3 x 40 MW) |
View/Download |
| अगस्त 25, 2025 |
Transcript of Annual Analysts & Institutional Investors Meet held on 18 August 2025 |
View/Download |
| अगस्त 24, 2025 |
Declaration of COD of the part capacity of 50 MW (Solar) by a Group Company of NTPC’s subsidiary namely NTPC Green Energy Limited w.e.f. 24.08.2025 |
View/Download |
| अगस्त 22, 2025 |
Disclosure dated 21.08.2025 made by NTPC’s Subsidiary NTPC Green Energy Limited regarding declaration of COD of the third part capacity of 49.125 MW out of 300 MW Khavda Solar Energy Project |
View/Download |
| अगस्त 20, 2025 |
Disclosure dated 19.08.2025 made by NTPC’s subsidiary NTPC Green Energy Limited |
View/Download |
| अगस्त 18, 2025 |
Investor Presentation proposed to be made at the 21st Annual Analysts and Institutional Investors Meet of NTPC Limited on 18 August 2025 |
View/Download |
| अगस्त 18, 2025 |
Link for accessing Audio Recording of 21st Annual Analyst and Institutional Investors meet. |
View/Download |
| अगस्त 13, 2025 |
Intimation regarding Cabinet approval on Investment Proposal for construction of 700 MW Tato-II Hydro Electric Project in Shi Yomi District of Arunachal Pradesh with an outlay of Rs. 8146.21 crore and completion period of 72 months. |
View/Download |
| अगस्त 13, 2025 |
Newspaper publication regarding change in time of 49th Annual General Meeting |
View/Download |
| अगस्त 12, 2025 |
Intimation regarding change in time of the 49th Annual General Meeting |
View/Download |
| अगस्त 08, 2025 |
Newspaper publication regarding Notice of 49th Annual General Meeting is enclosed. |
View/Download |
| अगस्त 08, 2025 |
Hosting its 21st Annual Analysts and Institutional Investors Meet on 18 August 2025 in Mumbai |
View/Download |
| अगस्त 07, 2025 |
Business Responsibility and Sustainability Report for Financial Year 2024-25 |
View/Download |
| अगस्त 07, 2025 |
Notice of 49th Annual General Meeting |
View/Download |
| अगस्त 07, 2025 |
Submission of Integrated Annual Report for Financial Year 2024-25 |
View/Download |
| अगस्त 05, 2025 |
Disclosures dated 04.08.2025 made by NTPC’s subsidiary namely NTPC Green Energy Limited |
View/Download |
| अगस्त 01, 2025 |
Newspaper Advertisement- Disclosure under Regulation 30 and Regulation 47 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. |
View/Download |
| जुलाई 31, 2025 |
Change in Senior Management due to superannuation on 31.07.2025 |
View/Download |
| जुलाई 31, 2025 |
Declaration of COD of the third part capacity of 6 MW out of 150 MW Dayapar Wind Energy Project (Phase-I) of NTPC Renewable Energy Limited (NTPC REL) |
View/Download |
| जुलाई 29, 2025 |
Integrated Filing (Financials) - Submission Of Unaudited Financial Results for the Quarter Ended 30 June 2025. |
View/Download |
| जुलाई 29, 2025 |
Intimation of the date of 49th Annual General Meeting (i.e.29th August 2025) of the Company and record date (i.e. 4th September 2025) for the purpose of Final Dividend for the FY 2024-25 |
View/Download |
| जुलाई 29, 2025 |
Board Meeting Outcome regarding
1. Re-appointment of Shri Gurdeep Singh (DIN: 00307037) as Chairman & Managing Director of NTPC Limited
2. Appointment of Secretarial Auditor |
View/Download |
| जुलाई 29, 2025 |
Intimation of Record Date (i.e. 4th September 2025) for the purpose of Final Dividend for FY 2024-25 |
View/Download |
| जुलाई 29, 2025 |
Change in Directorate |
View/Download |
| जुलाई 29, 2025 |
Board Meeting Outcome for Integrated Filing (Financials) - Submission of Unaudited Financial Results for The Quarter Ended 30 June 2025. |
View/Download |
| जुलाई 29, 2025 |
Operational and Financial Snapshot for the Quarter Ended 30 June 2025. |
View/Download |
| जुलाई 29, 2025 |
Appointment of M/s Agarwal S. & Associates, Company Secretaries (FRN No.: P2003DE49100) as Secretarial Auditor of the Company for a period of five years i.e. from the Financial Year 2025-26 to 2029-30 subject to approval of shareholders at ensuing Annual General Meeting. |
View/Download |
| जुलाई 24, 2025 |
Outcome of Postal Ballot-Voting Results & Scrutinizer Report |
View/Download |
| जुलाई 23, 2025 |
Closure of Trading Window for the quarter ended 30.06.2025 |
View/Download |
| जुलाई 23, 2025 |
Board Meeting Intimation for Considering Un-Audited Financial Results for the Quarter Ended 30th June 2025 |
View/Download |
| जुलाई 22, 2025 |
Newspaper publication regrading transfer of Equity Shares to the IEPF |
View/Download |
| जुलाई 18, 2025 |
Intimation regarding re-employment of the Chairman & Managing Director |
View/Download |
| जुलाई 17, 2025 |
Announcement under Regulation 30 (LODR)-Newspaper Publication |
View/Download |
| जुलाई 17, 2025 |
Intimation regarding Cabinet approval accorded for enhanced delegation of Power to NTPC Limited for investment in NTPC Green Energy Limited, a subsidiary company, for Renewable Energy Capacity addition |
View/Download |
| जुलाई 16, 2025 |
Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 |
View/Download |
| जुलाई 08, 2025 |
Change in Senior Management on 08.07.2025 due to pre-mature retirement |
View/Download |
| जुलाई 08, 2025 |
Declaration of COD of Unit II (250 MW) of Tehri PSP (4X250 MW) of THDC India Limited |
View/Download |
| जुलाई 01, 2025 |
Disclosure dated 30.06.2025 made by NTPC’s subsidiary NTPC Green Energy Limited regarding declaration of COD of the second part capacity of 32.80 MW out of 300 MW Khavda Solar Energy Project and the third part capacity of 64.7 MW out of 1255 MW Khavda-I Solar PV |
View/Download |
| जून 29, 2025 |
Disclosure dated 28.06.2025 made by NTPC’s subsidiary NTPC Green Energy Limited regarding declaration of COD of the third and last part capacity of 120 MW out of 220 MW Shajapur Solar Project (Unit-II) of NTPC Renewable Energy Limited (NTPC REL) |
View/Download |
| जून 28, 2025 |
Disclosure dated 27.06.2025 made by NTPC’s subsidiary NTPC Green Energy Limited regarding declaration of COD of the first part capacity of 142.2 MW out of 300 MW Khavda |
View/Download |
| जून 27, 2025 |
Change in Management on 30.06.2025 due to superannuation |
View/Download |
| जून 26, 2025 |
Declaration of COD of Unit#3 (660 MW) of Barh Super Thermal Power Project, Stage-I (3X660 MW) |
View/Download |
| जून 24, 2025 |
Closure of Trading Window for Q1 FY 2025-26 |
View/Download |
| जून 23, 2025 |
Notice of Postal Ballot for issue of secured/unsecured, redeemable, taxable/tax-free, cumulative/non-cumulative, non-convertible debentures up to Rs. 18,000 Crore |
View/Download |
| जून 22, 2025 |
Declaration of COD of Second & Last Part Capacity of 52 MW out of 245 MW at plot-3 of NTPC's Nokh Solar PV Project (3X245 MW) under CPSU Scheme Phase-II, Tranche -III |
View/Download |
| जून 21, 2025 |
Appointment of Cost Auditors for the Financial Year 2025-26 |
View/Download |
| जून 21, 2025 |
Board Meeting Outcome for for Raising of Funds Through Issue of Non-Convertible Debentures |
View/Download |
| जून 18, 2025 |
Change in Senior Management on 18.06.2025 due to pre-mature retirement |
View/Download |
| जून 16, 2025 |
Board Meeting Intimation for Raising of Funds Through Issue of Non-Convertible Debentures |
View/Download |
| जून 16, 2025 |
Change in Senior Management on 16.06.2025 due to pre-mature retirement |
View/Download |
| जून 14, 2025 |
Intimation of approval accorded by Committee of Creditors (CoC) in relation to Resolution Plan submitted by the Consortium of Maharashtra State Power Generation Company Limited and NTPC Limited (“Consortium”) for Sinnar Thermal Power Limited (“STPL”), a company undergoing Corporate Insolvency Resolution Process ("CIRP") under the Insolvency and Bankruptcy Code 2016 ("IBC") |
View/Download |
| जून 13, 2025 |
Intimation of NTPC’s decision to issue unsecured non-convertible debentures of Rs.4,000 crore on 17.06.2025, through private placement at a coupon of 6.89% p.a. for a tenor of 10 years 1 day, maturing on 18.06.2035 |
View/Download |
| जून 13, 2025 |
Declaration of COD of Unit-3 (660 MW) of North Karanpura Super Thermal Power Project (3X660mw) |
View/Download |
| जून 12, 2025 |
Completion of Trial Operation by 660 MW Capacity Unit of North Karanpura Super Thermal Power Project |
View/Download |
| जून 12, 2025 |
Completion of Trial Operation by 660 MW Capacity Unit of BARH Super Thermal Power Project, Stage-1 |
View/Download |
| जून 09, 2025 |
Intimation of amendment to the Code for Prevention of Insider Trading in the Securities of NTPC |
View/Download |
| जून 09, 2025 |
Disclosure regarding ESG rating assigned by NSE Sustainability Ratings & Analytics Ltd (“NSE Sustainability”) to NTPC |
View/Download |
| जून 08, 2025 |
Declaration of COD of 193 MW out of 245 MW Capacity at Plot-3 of NTPC’s Nokh Solar PV Project (3X245 MW) |
View/Download |
| जून 06, 2025 |
Commercial Operation of First Unit of 250 MW of Tehri PSP (4X250 MW) of THDC India Limited, a Subsidiary of NTPC Limited. |
View/Download |
| जून 06, 2025 |
Declaration of COD of First Part Capacity Of 110.25 MW Out Of 1255 MW Khavda 1 Solar PV Project In Gujarat of NTPC Renewable Energy Limited (NTPC REL), A Stepdown Subsidiary of NTPC Limited through its Subsidiary NTPC Green Energy Limited. |
View/Download |
| जून 01, 2025 |
Change in Senior Management on 31.05.2025 |
View/Download |
| मई 30, 2025 |
Notices received from Stock Exchanges regarding imposition of fines due to non-compliance w.r.t. composition of Board of Directors and Board level Committees |
View/Download |
| मई 29, 2025 |
Transcript of Conference call held with Analysts & Investors on 24 May 2025. |
View/Download |
| मई 25, 2025 |
Correction in disclosure dated 16th May 2025 w.r.t. Shri Pankaj Gupta, Additional Director (Independent Director) |
View/Download |
| मई 24, 2025 |
Link for Audio Recording of conference call held with Analysts & Investors on 24 May 2025 |
View/Download |
| मई 24, 2025 |
Submission of Audited Financial Results for the Quarter and year ended 31 March 2025. |
View/Download |
| मई 24, 2025 |
Integrated Filing (Financial) regarding submission of Audited Financial results for the Quarter and Year ended 31 March 2025. |
View/Download |
| मई 24, 2025 |
Board Meeting Outcome for Recommendation of Final Dividend for the Financial Year 2024-25. |
View/Download |
| मई 24, 2025 |
Operational & Financial Snapshot of the Company for Quarter and year ended 31 March 2025. |
View/Download |
| मई 20, 2025 |
Corporate Disclosure regarding Con Call discussion the Company’s results for Quarter and Year ended March 31, 2025 |
View/Download |
| मई 20, 2025 |
Details of conference call to be held on 24th May 2025 to discuss the Company’s results for the quarter, and year ended 31st March 2025 with the Analysts and Investors. |
View/Download |
| मई 19, 2025 |
Board Meeting Intimation for Considering Annual Standalone and Consolidated Financial Statements for the year ended 31st March 2025 and recommendation of Dividend for The Year Ended 31st March 2025, |
View/Download |
| मई 19, 2025 |
Intimation regarding appointment of Dr. Kanchiappan Ghayathri Devi (alias Dr. K. Ghayathri Devi) (DIN: 07584524) and Shri Sushil Kumar Choudhary (DIN: 11111980) as Additional Directors (Independent Directors) on the Board of NTPC Limited |
View/Download |
| मई 19, 2025 |
Closure of trading window from 1st April 2025 shall remain closed till 26th May 2025. |
View/Download |
| मई 16, 2025 |
Intimation regarding appointment of Dr. Anil Kumar Gupta (DIN: 00442146) and Shri Pankaj Gupta (DIN: 03415536) as Additional Directors (Independent Directors) on the Board of NTPC Limited |
View/Download |
| मई 16, 2025 |
Intimation regarding appointment of Shri Sushil Chaudhari as Independent Director on the Board of NTPC Limited |
View/Download |
| मई 16, 2025 |
Submission of Annual Secretarial Compliance Report for the year ended 31st March 2025 |
View/Download |
| मई 15, 2025 |
Intimation regarding appointment of Dr. K. Ghayathri Devi, Dr. Anil Kumar Gupta and Shri Pankaj Gupta as Independent Director on the Board of NTPC Limited |
View/Download |
| मई 07, 2025 |
Intimation regarding NTPC’s decision to Issue Unsecured Non-Convertible Debentures of Rs.4,000 Crore on 09.05.2025, through Private Placement at a Coupon of 6.84% P.A. for a tenor of 10 Years, maturing on 09.05.2035. |
View/Download |
| मई 02, 2025 |
Declaration of COD of third and last part capacity of 60 MW out of 150 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited (NTPC REL), a stepdown subsidiary of NTPC Limited through its subsidiary NTPC Green Energy Limited. |
View/Download |
| मई 01, 2025 |
Declaration of COD of 75 MW capacity by a group company of NTPC’s subsidiary NTPC Green Energy Limited w.e.f. 00:00 Hrs. of 02.05.2025 |
View/Download |
| अप्रैल 17, 2025 |
Intimation of the appointment of Shri Anil Kumar Trigunayat (DIN: 07900294), as an Additional Director (Independent Director) on the Board of the Company |
View/Download |
| अप्रैल 08, 2025 |
Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 for quarter ended 31st March 2025 |
View/Download |
| अप्रैल 08, 2025 |
Declaration of COD of second part capacity of 90 MW out of 150 MW Dayapar Wind Energy Project Phase-I of NTPC Renewable Energy Limited (NTPC REL) |
View/Download |
| अप्रैल 02, 2025 |
Cautionary Notices received from Stock Exchanges |
View/Download |
| अप्रैल 01, 2025 |
Change in Senior Management due to superannuation on 31.03.2025 |
View/Download |